Appartementencomplex Pattistpark II Terneuzen
Complete mechanical installations for the 18-storey Pattistpark II residential tower in Terneuzen, from pluvia drainage to bathroom fit-out and plant rooms.





- Service area
- Terneuzen
- Status
- In progress
At Pattistpark in Terneuzen, the striking Pattistpark II development is taking shape. Installatiebedrijf Groosman B.V. is delivering the complete mechanical installations for this 18-storey residential tower.
With the structure reaching its highest point, the project is advancing across multiple concurrent construction phases:
- Roof level: Ventilation ducts and specialized siphonic (pluvia) rainwater drainage systems cast into the roof slab for high-capacity rainwater discharge.
- Floor 13: Installation of wall pipework for water and drainage systems.
- Floor 11: Installation of underfloor heating distribution loops.
- Intermediate floors: Installation of concealed cistern frames, drains, and sanitary rough-ins.
- Floor 6: Final fit-out and commissioning of complete bathrooms.
- Lower floors: Central technical plant rooms fully fitted, connected, and ready for operation.
From structural rough-ins at height to precision sanitary finishing, Pattistpark II demonstrates Groosman’s comprehensive technical capability in large-scale residential and commercial construction.
Ready to discuss your installation?
Request a free quote or call our service desk directly.
